Files
HF-MES-manual/en/business/quality.md

452 lines
16 KiB
Markdown
Raw Normal View History

2026-05-12 01:46:34 +08:00
# Quality and Traceability
## 1. Function Overview
The Quality Management module implements full-process quality control from raw materials to finished products, including incoming inspection, in-process inspection, finished product inspection, quality exception handling, and traceability management, ensuring stable and controllable product quality.
**Core Functions:**
| Function | Description |
|----------|-------------|
| Inspection Standards | Inspection items and standards definition |
| IQC Inspection | Incoming quality control |
| IPQC Inspection | In-process quality control |
| FQC/OQC | Finished/Outgoing inspection |
| Quality Exception | Defective product handling, MRB management |
| Quality Traceability | Forward/Reverse traceability |
## 2. Quality Management System
### 2.1 Quality Management Process
**Total Quality Management Process:**
```
Raw Material Inspection → Production Process Control → Finished Product Inspection → Outgoing Inspection
│ │ │ │
▼ ▼ ▼ ▼
IQC IPQC FQC OQC
```
### 2.2 Quality Management Principles
| Principle | Description |
|-----------|-------------|
| Prevention First | Move quality control to design and production stages |
| Total Participation | Quality is everyone's responsibility |
| Process Control | Focus on every step of the production process |
| Continuous Improvement | Continuously optimize quality management system |
| Data Driven | Make decisions based on data analysis |
## 3. Inspection Standard Management
### 3.1 Inspection Standard Definition
**Inspection Standard Components:**
| Component | Description |
|-----------|-------------|
| Inspection Type | IQC/IPQC/FQC/OQC |
| Inspection Item | Specific item to inspect |
| Inspection Method | How to perform inspection |
| Judgment Standard | Criteria for pass/fail determination |
| Inspection Equipment | Required inspection equipment |
| Sampling Plan | Sampling quantity and rules |
### 3.2 Inspection Item Types
| Item Type | Description | Example |
|-----------|-------------|---------|
| Visual Inspection | Visual check | Color, shape, surface quality |
| Dimension Inspection | Dimension measurement | Length, width, height, diameter |
| Function Inspection | Function test | Electrical performance, mechanical performance |
| Performance Inspection | Performance test | Life, reliability |
| Safety Inspection | Safety test | Insulation, withstand voltage |
### 3.3 Inspection Standard Creation
**Creation Steps:**
1. Go to [Quality Management] → [Inspection Standards]
2. Click [New Inspection Standard]
3. Fill in standard information:
- Standard code
- Standard name
- Applicable product
- Inspection type
4. Add inspection items
5. Define inspection methods
6. Set judgment standards
7. Save inspection standard
**[Tip]** Inspection standards need approval before becoming effective.
### 3.4 Sampling Plan
**Sampling Standards:**
| Sampling Standard | Description | Application Scenario |
|-------------------|-------------|---------------------|
| GB/T 2828.1 | Normal inspection single sampling plan | Regular inspection |
| GB/T 2829 | Periodic inspection sampling plan | Periodic sampling |
| AQL Sampling | Acceptable quality level sampling | Large batch inspection |
| 100% Inspection | Full inspection | Critical items |
**AQL Standard Example:**
| Inspection Lot Size | AQL 1.0 | AQL 2.5 | AQL 4.0 |
|---------------------|---------|---------|---------|
| 26-50 | 3 | 5 | 7 |
| 51-90 | 5 | 7 | 10 |
| 91-150 | 8 | 12 | 18 |
| 151-280 | 13 | 18 | 25 |
## 4. Incoming Quality Control (IQC)
### 4.1 IQC Process
**IQC Complete Process:**
```
┌──────────┐ ┌──────────┐ ┌──────────┐ ┌──────────┐
│ Arrival │───▶│Receiving │───▶│ IQC │───▶│ Judgment │
│ Receive │ │Document │ │ Inspection│ │ │
└──────────┘ └──────────┘ └──────────┘ └──────────┘
┌──────────────────────────────────┐
│ Non-conforming Handling │
│ ┌──────┐ ┌──────┐ ┌──────┐ │
│ │Return │ │Concession│ │Scrap │ │
│ │ │ │Acceptance│ │ │ │
│ └──────┘ └──────┘ └──────┘ │
└──────────────────────────────────┘
```
### 4.2 IQC Inspection Execution
**Inspection Steps:**
1. Supplier delivery arrives
2. Warehouse clerk creates receiving document
3. System automatically pushes inspection task to IQC
4. IQC inspector receives inspection task
5. Execute incoming inspection:
- Verify delivery note against order
- Visual inspection
- Quantity verification
- Sampling inspection
6. Record inspection data
7. Determine inspection result
**Inspection Judgment:**
| Judgment Result | Description | Handling Method |
|-----------------|-------------|-----------------|
| Qualified | Accept for storage | Direct receiving |
| Concession Acceptance | Special release | Requires approval |
| Rejected | Return to supplier | Return to supplier |
### 4.3 IQC Inspection Record
**Inspection Record Information:**
| Record Item | Description |
|-------------|-------------|
| Inspection No. | IQC inspection document number |
| Supplier | Material supplier |
| Material Code | Material being inspected |
| Material Batch | Material batch number |
| Arrival Quantity | Arrival quantity |
| Sampling Quantity | Sampled quantity |
| Qualified Quantity | Qualified quantity |
| Defective Quantity | Defective quantity |
| Qualification Rate | Qualified quantity/Sampling quantity |
| Inspection Conclusion | Qualified/Unqualified |
| Inspector | Person performing inspection |
| Inspection Time | Inspection time |
## 5. In-Process Quality Control (IPQC)
### 5.1 IPQC Types
| Inspection Type | Timing | Description |
|-----------------|--------|-------------|
| First Article Inspection | At start of each batch | Inspection of first product |
| Patrol Inspection | During production | Regular patrol inspection |
| Sampling Inspection | Per sampling plan | Random sampling inspection |
| Last Article Inspection | At end of each batch | Inspection of last product |
### 5.2 First Article Inspection
**First Article Inspection Process:**
```
Start Production → First Article Production → First Article Inspection → Qualified → Mass Production
Unqualified
Root Cause Analysis & Correction
```
**First Article Inspection Timing:**
| Timing | Description |
|--------|-------------|
| Shift Change | First after shift handover |
| Material Change | First after material change |
| Process Change | First after process adjustment |
| After Equipment Repair | First after equipment repair |
### 5.3 Patrol Inspection Management
**Patrol Inspection Points:**
| Inspection Item | Check Content | Check Method |
|-----------------|---------------|--------------|
| Process Parameters | Temperature, pressure, time | Check equipment parameters |
| Material Usage | Correct material usage | Verify material identification |
| Operation Method | Standard operation | Observe operation process |
| Product Appearance | Normal appearance | Visual inspection |
| Equipment Status | Normal equipment operation | Check equipment running status |
**Patrol Inspection Record:**
| Record Item | Description |
|-------------|-------------|
| Inspection Time | Inspection time |
| Inspection Station | Station being inspected |
| Inspector | Person performing inspection |
| Inspection Item | Item being checked |
| Check Result | Inspection result |
| Abnormal Description | Issues found (if any) |
## 6. Finished Product Inspection (FQC/OQC)
### 6.1 FQC (Final Quality Control)
**FQC Inspection Content:**
| Inspection Category | Inspection Item |
|---------------------|-----------------|
| Visual Inspection | Color, marking, packaging |
| Dimension Inspection | External dimensions |
| Function Inspection | Electrical performance test |
| Safety Inspection | Safety item test |
| Reliability Inspection | Aging test, etc. |
### 6.2 OQC (Outgoing Quality Control)
**OQC Inspection Content:**
| Inspection Item | Description |
|-----------------|-------------|
| Quantity Verification | Verify outgoing quantity |
| Visual Check | Check packaging appearance |
| Marking Check | Check labels and markings |
| Random Sampling | Sampling per sampling plan |
| Documentation Check | Check accompanying documents |
### 6.3 Finished Product Receiving Process
**Receiving Conditions:**
```
FQC Passed → OQC Passed → Packaging Complete → Finished Product Receiving
```
**Receiving Requirements:**
| Requirement | Description |
|-------------|-------------|
| Inspection Complete | FQC/OQC inspection must be completed |
| Inspection Qualified | Inspection result must be qualified |
| Batch Identification | Must have batch identification |
| Packaging Complete | Packaging must be intact |
| Quantity Accurate | Quantity must be accurate |
## 7. Quality Exception Handling
### 7.1 Defective Product Classification
| Defect Category | Description | Handling Method |
|-----------------|-------------|-----------------|
| Visual Defect | Color, shape, surface defects | Rework/Scrap |
| Dimension Defect | Dimension out of tolerance | Rework/Downgrade |
| Function Defect | Function not meeting standard | Rework/Scrap |
| Performance Defect | Performance not meeting standard | Rework/Downgrade |
| Safety Defect | Safety hazard | Scrap |
### 7.2 MRB Handling Process
**MRB Process:**
```
┌──────────┐ ┌──────────┐ ┌──────────┐ ┌──────────┐
│Defective │───▶│ MRB │───▶│ Review │───▶│ Disposal │
│Identify │ │ Initiate│ │ Judgment │ │ Execution│
└──────────┘ └──────────┘ └──────────┘ └──────────┘
```
**MRB Disposal Methods:**
| Disposal Method | Description | Approval Requirement |
|-----------------|-------------|---------------------|
| Rework | Return to process for reprocessing | Requires approval |
| Downgrade | Use at lower grade | Requires approval |
| Concession Acceptance | Accept under special circumstances | Senior management approval |
| Scrap | Direct scrap | Requires approval |
| Return | Return to supplier | Contact supplier |
### 7.3 Quality Exception Handling Steps
**Handling Steps:**
1. Discover quality issue
2. Isolate non-conforming products
3. Label non-conforming products
4. Create MRB document
5. Quality review
6. Determine review result
7. Execute disposal plan
8. Confirm disposal
**[Tip]** Non-conforming products must be stored in isolation to prevent misuse.
## 8. Quality Traceability
### 8.1 Traceability Content
**Traceability Data Elements:**
| Traceability Element | Traceability Content |
|---------------------|---------------------|
| Material Origin | Raw material supplier, batch |
| Production Process | Process, equipment, personnel |
| Quality Data | Inspection records, defective products |
| Equipment Data | Equipment parameters, status |
| Environmental Data | Production environment conditions |
### 8.2 Forward Traceability
**Forward Traceability Process:**
```
Material Batch → Semi-finished Batch → Finished Product Batch → Customer
```
**Traceability Query:**
1. Input finished product batch number
2. Query finished product production information:
- Production work order
- Production process
- Production time
- Operator
- Equipment used
3. Query materials used:
- Material batch
- Supplier
- IQC inspection result
4. Continue tracing upstream materials
### 8.3 Reverse Traceability
**Reverse Traceability Process:**
```
Finished Product Batch → Semi-finished Batch → Material Batch → Supplier
```
**Traceability Query:**
1. Input material batch number
2. Query material usage:
- Work orders used in
- Processes used in
- Finished product batches produced
3. Query finished product destination:
- Shipping records
- Customer information
### 8.4 Traceability Query Example
**Query Scenario:** Customer complaint about quality issue in a product batch
**Traceability Steps:**
1. Query using batch number provided by customer
2. Trace this batch's:
- Production work order information
- Production status at each process
- Material batches used
- Material suppliers
- Quality inspection records
3. Analyze quality issue root cause
4. Determine impact scope
5. Notify affected customers
6. Develop improvement measures
**Traceability Result Example:**
| Item | Information |
|------|-------------|
| Finished Product Batch | LOT-20260410-001 |
| Product Model | PCB-1000 |
| Production Work Order | WO-20260410001 |
| Production Date | 2026-04-10 |
| Production Line | SMT-A Line |
| Operators | Zhang San, Li Si |
| Materials Used | Solder batch LOT-S-001 (Supplier: Company A) |
| Inspection Records | First article qualified, patrol inspection qualified |
| Shipping Records | Shipped to Customer B, quantity 1000PCS |
## 9. Quality Statistics and Analysis
### 9.1 Quality Indicators
**Core Quality KPIs:**
| Indicator | Calculation Formula | Target Value |
|-----------|---------------------|--------------|
| Incoming Qualification Rate | IQC Qualified Lots/IQC Total Lots × 100% | ≥98% |
| Process Qualification Rate | IPQC Qualified Quantity/IPQC Total Inspected × 100% | ≥99% |
| Finished Product Qualification Rate | FQC Qualified Quantity/FQC Total Inspected × 100% | ≥99.5% |
| Defective Rate | Defective Quantity/Total Production × 100% | ≤1% |
| Batch Traceability Rate | Successfully Traced Batches/Total Batches × 100% | 100% |
### 9.2 Quality Reports
| Report Type | Description | Target User |
|-------------|-------------|-------------|
| IQC Daily Report | Daily incoming inspection statistics | IQC Team Leader |
| IPQC Daily Report | Daily in-process inspection statistics | IPQC Team Leader |
| Quality Monthly Report | Monthly quality summary report | Quality Manager |
| Defect Analysis | Defect root cause analysis | Quality Engineer |
| Trend Analysis | Quality trend analysis | Quality Supervisor |
### 9.3 SPC Statistical Process Control
**Control Chart Monitoring:**
| Control Chart Type | Monitoring Content | Application Scenario |
|--------------------|-------------------|---------------------|
| X-bar Chart | Mean value monitoring | Measurement data |
| R Chart | Range monitoring | Measurement data |
| P Chart | Defective rate monitoring | Count data |
| C Chart | Defect count monitoring | Count data |
**异常判定规则:**
| Rule | Judgment Condition | Description |
|------|-------------------|-------------|
| Rule 1 | 1 point outside control limits | Single point abnormality |
| Rule 2 | 9 consecutive points on same side of center line | Shift abnormality |
| Rule 3 | 6 consecutive points increasing or decreasing | Trend abnormality |
| Rule 4 | 14 consecutive points alternating up and down | Periodic abnormality |
---
**End of Quality and Traceability**