Files
HF-MES-manual/en/business/equipment-warehouse.md
2026-05-12 01:46:34 +08:00

16 KiB
Raw Blame History

Equipment and Warehouse Management

1. Function Overview

This section covers two major modules: Equipment Management and Warehouse Logistics. It implements full lifecycle management of equipment and warehouse logistics management of materials to ensure smooth production processes.

Main Contents:

Chapter Main Content
Equipment Management Equipment ledger, inspection & maintenance, fault repair, OEE analysis
Warehouse Logistics Receiving management, issuing management, inventory management

2. Equipment Management

2.1 Equipment Ledger

Equipment Information Management:

Function Description
Equipment Registration Basic equipment information entry
Equipment Query Query equipment information by conditions
Equipment Change Equipment information change management
Equipment Scrap Equipment scrap process handling
Equipment Documents Equipment document management

Equipment Lifecycle:

Equipment Procurement → Equipment Installation → Equipment Acceptance → Equipment Operation → Equipment Maintenance → Equipment Scrap

2.2 Equipment Inspection

Inspection Types:

Inspection Type Execution Cycle Executor Main Content
Daily Inspection Daily Operator Equipment running status check
Periodic Inspection Weekly/Monthly Maintenance Technician Equipment performance check
Precision Inspection Quarterly/Yearly Engineer Equipment accuracy check

Inspection Process:

Inspection Plan Generation → Inspection Task Assignment → Execute Inspection → Inspection Record → Abnormal Handling

Inspection Execution Steps:

  1. Receive inspection task
  2. Arrive at equipment location
  3. Perform inspection item by item according to standards
  4. Record inspection results
  5. Submit inspection record
  6. Trigger abnormal handling process if any abnormality found

Inspection Record Information:

Record Item Description
Inspection Order No. Unique identifier for inspection order
Equipment No. Equipment being inspected
Inspection Type Daily/Periodic/Precision
Inspector Person performing inspection
Inspection Time Inspection time
Inspection Items Items being inspected
Inspection Result Normal/Abnormal
Abnormal Description Description of abnormality

2.3 Equipment Maintenance

Maintenance Types:

Maintenance Type Cycle Content Man-hours
Daily Maintenance Daily Cleaning, lubrication, tightening 15-30min
Level 1 Maintenance Weekly Cleaning, lubrication, adjustment 2-4h
Level 2 Maintenance Monthly Cleaning, lubrication, tightening, replace wear parts 8h
Level 3 Maintenance Quarterly Comprehensive inspection, adjustment, replacement 1-2 days
Major Overhaul Yearly Complete disassembly and inspection 3-7 days

Maintenance Process:

Maintenance Plan → Maintenance Preparation → Maintenance Execution → Maintenance Record → Acceptance Confirmation

Maintenance Content:

Maintenance Item Content Required Materials
Cleaning Equipment surface and internal cleaning Cleaning agent, rags
Lubrication Lubrication of moving parts Lubricating oil
Tightening Check and tighten loose parts Wrenches and tools
Adjustment Adjust equipment parameters Adjustment tools
Replacement Replace wear parts Spare parts

2.4 Equipment Fault Management

Fault Classification:

Fault Category Description Repair Requirement
Minor Fault No impact on production Repair within 2 hours
General Fault Partial function affected Repair within 4 hours
Serious Fault Equipment down Repair within 8 hours
Emergency Fault Equipment damaged Immediate response

Fault Handling Process:

Fault Discovery → Fault Report → Fault Diagnosis → Repair Processing → Repair Acceptance → Fault Record

Fault Reporting Steps:

  1. Discover equipment fault
  2. Assess fault impact
  3. Emergency shutdown (if needed)
  4. Submit fault report
  5. Maintenance technician receives work order
  6. Fault diagnosis
  7. Execute repair
  8. Repair acceptance
  9. Archive fault record

Fault Report Information:

Field Description
Report No. Unique identifier for fault report
Equipment No. Faulty equipment
Fault Type Type of fault
Fault Description Description of fault
Fault Time Time fault discovered
Reporter Person reporting fault
Urgency Level Emergency/General/Minor
Impact Scope Impact on production

Maintenance Record Information:

Record Item Description
Repair No. Unique identifier for repair order
Repair Technician Person performing repair
Repair Start Time Start time of repair
Repair End Time Completion time of repair
Fault Cause Cause of fault
Repair Measures Repair methods taken
Spare Parts Replaced List of replaced parts
Repair Result Repair effectiveness

2.5 Equipment OEE Analysis

OEE Concept:

OEE (Overall Equipment Effectiveness) is a ratio measuring the actual production capacity versus the theoretical production capacity of equipment.

OEE Calculation Formula:

OEE = Availability × Performance × Quality

Where:
- Availability = Actual Operating Time / Planned Operating Time × 100%
- Performance = Actual Output / Theoretical Output × 100%
- Quality = Qualified Product Quantity / Total Output Quantity × 100%

OEE Standards:

OEE Value Level Description
≥85% World Class Excellent
70%-85% Good Meeting standard
60%-70% Average Needs improvement
<60% Poor Requires focused improvement

OEE Analysis Dimensions:

Analysis Dimension Loss Type Description
Availability Fault Downtime Downtime due to equipment failure
Availability Changeover & Setup Product changeover and setup time
Performance Idle & Minor Stops Short stops
Performance Speed Loss Running speed below theoretical speed
Quality Scrap Defective products
Quality Rework Products requiring rework

OEE Improvement Measures:

Loss Type Improvement Measures
Fault Downtime Strengthen preventive maintenance
Changeover & Setup Optimize changeover process
Idle & Minor Stops Optimize operation process
Speed Loss Equipment upgrade and modification
Scrap & Rework Strengthen quality control

3. Warehouse Logistics

3.1 Warehouse Layout

Warehouse Zone Planning:

Zone Type Purpose Characteristics
Inspection Zone Pending inspection materials Isolated storage
Raw Material Zone Raw material storage Zoned by category
Semi-finished Zone Semi-finished product storage Batch management
Finished Goods Zone Finished product storage FIFO
Return Zone Returned materials Separate management
Scrap Zone Scrap storage Safety isolation
Defective Zone Defective product storage Clear identification

Location Coding Rules:

Code Example Meaning
A-01-001 Zone A, Row 01, Position 001
B-02-005 Zone B, Row 02, Position 005
C-03-010 Zone C, Row 03, Position 010

3.2 Receiving Management

Receiving Types:

Receiving Type Description Document Type
Purchase Receiving Purchased materials arrival Purchase Receipt
Production Receiving Production finished goods Production Receipt
Return Receiving Sales return Return Receipt
Transfer Receiving Transfer from other warehouse Transfer Order
Other Receiving Other reasons Other Receipt

Receiving Process:

┌──────────┐    ┌──────────┐    ┌──────────┐    ┌──────────┐
│  Arrival │───▶│ Document │───▶│   IQC    │───▶│ Inspection│
│  Receive │    │  Create  │    │  Trigger │    │  Execute │
└──────────┘    └──────────┘    └──────────┘    └──────────┘
                                                              │
                                                              ▼
┌──────────┐    ┌──────────┐    ┌──────────┐    ┌──────────┐
│Confirm   │◀───│Allocate  │◀───│Location  │◀───│ Qualified│ 
│Receiving │    │ Location │    │  Select  │    │  Decision│
└──────────┘    └──────────┘    └──────────┘    └──────────┘

Receiving Operation Steps:

  1. Materials arrive, receive delivery note
  2. Create receiving document
  3. System automatically pushes IQC inspection task
  4. Execute incoming inspection
  5. After passing inspection, allocate location
  6. Put materials onto designated location
  7. Scan location to confirm
  8. Complete receiving

Receiving Document Information:

Field Description
Receipt No. Unique identifier for receipt
Receiving Type Purchase/Production/Return etc.
Supplier Material supplier (for purchase)
Related Document Purchase order/work order etc.
Receiving Date Receiving date
Material Details List of received materials
Warehouse Receiving warehouse
Status Pending inspection/Received etc.

3.3 Issuing Management

Issuing Types:

Issuing Type Description Document Type
Production Issue Materials for production Issue Order
Sales Issue Sales delivery Sales Issue Order
Return Issue Return to supplier Return Order
Transfer Issue Transfer to other warehouse Transfer Order
Other Issue Other reasons Other Issue Order

Issuing Process:

┌──────────┐    ┌──────────┐    ┌──────────┐    ┌──────────┐
│ Material │───▶│ Document │───▶│ Picking  │───▶│ Approval │
│ Request  │    │  Create  │    │  Prepare │    │  Pass    │
└──────────┘    └──────────┘    └──────────┘    └──────────┘
                                                              │
                                                              ▼
┌──────────┐    ┌──────────┐
│Confirm   │◀───│ Scan     │
│ Issuing  │    │  Issue   │
└──────────┘    └──────────┘

Issuing Operation Steps:

  1. Create issue order based on work order or manually
  2. Select required materials
  3. System checks inventory status
  4. Approve issue order
  5. Warehouse personnel prepare and pick materials
  6. Scan materials and locations
  7. Confirm issuing
  8. Deliver materials to using department

Issue Order Information:

Field Description
Issue No. Unique identifier for issue order
Issue Type Production issue/Other
Related Work Order Work order related to issue
Issue Department Department requesting materials
Issuer Person issuing materials
Issue Date Issue date
Material Details List of issued materials
Warehouse Issuing warehouse
Status Pending approval/Issued etc.

3.4 Inventory Management

Inventory Query:

Query Dimension Query Content
By Material Inventory status of a material
By Warehouse Inventory status of a warehouse
By Location Inventory status of a location
By Batch Inventory status of a batch
By Status Inventory quantity distribution

Inventory Data:

Data Item Description
Material Code Material number
Material Name Material name
Warehouse Warehouse location
Location Storage location
Batch Material batch
Quantity Inventory quantity
Unit Unit of measurement
Inventory Status Normal/Frozen/Pending inspection

Inventory Accounting:

Account Type Description
Opening Inventory Inventory at period start
Current Receipt Quantity added this period
Current Issue Quantity removed this period
Closing Inventory Inventory at period end

Inventory Calculation Formula:

Closing Inventory = Opening Inventory + Current Receipt - Current Issue

3.5 Batch Management

Batch Traceability:

Traceability Dimension Traceability Content
Forward Traceability Raw Material → Finished Product
Reverse Traceability Finished Product → Raw Material

Batch Information:

Information Item Description
Batch No. Unique batch identifier
Material Batch Material batch
Supplier Batch Supplier provided batch
Production Batch Production batch
Receiving Date Receiving time
Expiry Date Shelf life
Inspection Status Qualified/Unqualified

First In First Out (FIFO):

Principle Description
First in, first out Earlier received materials issued first
Shelf life management Near expiry materials issued first
Clear batch identification Clear traceable batch identification

3.6 Inventory Alert

Alert Types:

Alert Type Trigger Condition Alert Content
Safety Stock Alert Inventory ≤ Safety Stock Low inventory alert
Expiry Alert Near expiry date Expiry approaching alert
Slow-moving Alert Long-term unused Material slow-moving alert
Maximum Stock Alert Inventory ≥ Maximum Stock High inventory alert

Inventory Control Strategies:

Strategy Description Application Scenario
Safety Stock Minimum inventory guarantee Regular materials
Maximum Stock Inventory upper limit control Avoid overstock
Reorder Point Replenish when inventory reaches reorder point Fixed quantity procurement
Periodic Order Regular inventory check and replenishment Periodic procurement

3.7 Inventory Count

Count Types:

Count Type Description Frequency
Full Count Count all materials Year-end
Partial Count Count selected materials Monthly/Weekly
Cycle Count Planned cyclic counting Daily
Dynamic Count Real-time counting Continuous

Count Process:

Count Plan → Count Preparation → Initial Count → Recount → Variance Review → Accounting Adjustment

Count Steps:

  1. Create count document
  2. Select warehouse and materials
  3. Execute initial count (first count)
  4. Execute recount (verification)
  5. Reconcile with system records
  6. Analyze count variances
  7. Approve variances
  8. Execute accounting adjustment

Count Records:

Record Item Description
Count No. Unique count document identifier
Count Type Full/Partial/Cycle
Count Warehouse Warehouse being counted
Count Date Count date
Book Quantity System recorded quantity
Actual Quantity Physically counted quantity
Variance Quantity Quantity difference
Variance Reason Reason for variance
Approval Status Pending approval/Approved

End of Equipment and Warehouse Management