Files
HF-MES-manual/en/business/quality.md
2026-05-12 01:46:34 +08:00

452 lines
16 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Quality and Traceability
## 1. Function Overview
The Quality Management module implements full-process quality control from raw materials to finished products, including incoming inspection, in-process inspection, finished product inspection, quality exception handling, and traceability management, ensuring stable and controllable product quality.
**Core Functions:**
| Function | Description |
|----------|-------------|
| Inspection Standards | Inspection items and standards definition |
| IQC Inspection | Incoming quality control |
| IPQC Inspection | In-process quality control |
| FQC/OQC | Finished/Outgoing inspection |
| Quality Exception | Defective product handling, MRB management |
| Quality Traceability | Forward/Reverse traceability |
## 2. Quality Management System
### 2.1 Quality Management Process
**Total Quality Management Process:**
```
Raw Material Inspection → Production Process Control → Finished Product Inspection → Outgoing Inspection
│ │ │ │
▼ ▼ ▼ ▼
IQC IPQC FQC OQC
```
### 2.2 Quality Management Principles
| Principle | Description |
|-----------|-------------|
| Prevention First | Move quality control to design and production stages |
| Total Participation | Quality is everyone's responsibility |
| Process Control | Focus on every step of the production process |
| Continuous Improvement | Continuously optimize quality management system |
| Data Driven | Make decisions based on data analysis |
## 3. Inspection Standard Management
### 3.1 Inspection Standard Definition
**Inspection Standard Components:**
| Component | Description |
|-----------|-------------|
| Inspection Type | IQC/IPQC/FQC/OQC |
| Inspection Item | Specific item to inspect |
| Inspection Method | How to perform inspection |
| Judgment Standard | Criteria for pass/fail determination |
| Inspection Equipment | Required inspection equipment |
| Sampling Plan | Sampling quantity and rules |
### 3.2 Inspection Item Types
| Item Type | Description | Example |
|-----------|-------------|---------|
| Visual Inspection | Visual check | Color, shape, surface quality |
| Dimension Inspection | Dimension measurement | Length, width, height, diameter |
| Function Inspection | Function test | Electrical performance, mechanical performance |
| Performance Inspection | Performance test | Life, reliability |
| Safety Inspection | Safety test | Insulation, withstand voltage |
### 3.3 Inspection Standard Creation
**Creation Steps:**
1. Go to [Quality Management] → [Inspection Standards]
2. Click [New Inspection Standard]
3. Fill in standard information:
- Standard code
- Standard name
- Applicable product
- Inspection type
4. Add inspection items
5. Define inspection methods
6. Set judgment standards
7. Save inspection standard
**[Tip]** Inspection standards need approval before becoming effective.
### 3.4 Sampling Plan
**Sampling Standards:**
| Sampling Standard | Description | Application Scenario |
|-------------------|-------------|---------------------|
| GB/T 2828.1 | Normal inspection single sampling plan | Regular inspection |
| GB/T 2829 | Periodic inspection sampling plan | Periodic sampling |
| AQL Sampling | Acceptable quality level sampling | Large batch inspection |
| 100% Inspection | Full inspection | Critical items |
**AQL Standard Example:**
| Inspection Lot Size | AQL 1.0 | AQL 2.5 | AQL 4.0 |
|---------------------|---------|---------|---------|
| 26-50 | 3 | 5 | 7 |
| 51-90 | 5 | 7 | 10 |
| 91-150 | 8 | 12 | 18 |
| 151-280 | 13 | 18 | 25 |
## 4. Incoming Quality Control (IQC)
### 4.1 IQC Process
**IQC Complete Process:**
```
┌──────────┐ ┌──────────┐ ┌──────────┐ ┌──────────┐
│ Arrival │───▶│Receiving │───▶│ IQC │───▶│ Judgment │
│ Receive │ │Document │ │ Inspection│ │ │
└──────────┘ └──────────┘ └──────────┘ └──────────┘
┌──────────────────────────────────┐
│ Non-conforming Handling │
│ ┌──────┐ ┌──────┐ ┌──────┐ │
│ │Return │ │Concession│ │Scrap │ │
│ │ │ │Acceptance│ │ │ │
│ └──────┘ └──────┘ └──────┘ │
└──────────────────────────────────┘
```
### 4.2 IQC Inspection Execution
**Inspection Steps:**
1. Supplier delivery arrives
2. Warehouse clerk creates receiving document
3. System automatically pushes inspection task to IQC
4. IQC inspector receives inspection task
5. Execute incoming inspection:
- Verify delivery note against order
- Visual inspection
- Quantity verification
- Sampling inspection
6. Record inspection data
7. Determine inspection result
**Inspection Judgment:**
| Judgment Result | Description | Handling Method |
|-----------------|-------------|-----------------|
| Qualified | Accept for storage | Direct receiving |
| Concession Acceptance | Special release | Requires approval |
| Rejected | Return to supplier | Return to supplier |
### 4.3 IQC Inspection Record
**Inspection Record Information:**
| Record Item | Description |
|-------------|-------------|
| Inspection No. | IQC inspection document number |
| Supplier | Material supplier |
| Material Code | Material being inspected |
| Material Batch | Material batch number |
| Arrival Quantity | Arrival quantity |
| Sampling Quantity | Sampled quantity |
| Qualified Quantity | Qualified quantity |
| Defective Quantity | Defective quantity |
| Qualification Rate | Qualified quantity/Sampling quantity |
| Inspection Conclusion | Qualified/Unqualified |
| Inspector | Person performing inspection |
| Inspection Time | Inspection time |
## 5. In-Process Quality Control (IPQC)
### 5.1 IPQC Types
| Inspection Type | Timing | Description |
|-----------------|--------|-------------|
| First Article Inspection | At start of each batch | Inspection of first product |
| Patrol Inspection | During production | Regular patrol inspection |
| Sampling Inspection | Per sampling plan | Random sampling inspection |
| Last Article Inspection | At end of each batch | Inspection of last product |
### 5.2 First Article Inspection
**First Article Inspection Process:**
```
Start Production → First Article Production → First Article Inspection → Qualified → Mass Production
Unqualified
Root Cause Analysis & Correction
```
**First Article Inspection Timing:**
| Timing | Description |
|--------|-------------|
| Shift Change | First after shift handover |
| Material Change | First after material change |
| Process Change | First after process adjustment |
| After Equipment Repair | First after equipment repair |
### 5.3 Patrol Inspection Management
**Patrol Inspection Points:**
| Inspection Item | Check Content | Check Method |
|-----------------|---------------|--------------|
| Process Parameters | Temperature, pressure, time | Check equipment parameters |
| Material Usage | Correct material usage | Verify material identification |
| Operation Method | Standard operation | Observe operation process |
| Product Appearance | Normal appearance | Visual inspection |
| Equipment Status | Normal equipment operation | Check equipment running status |
**Patrol Inspection Record:**
| Record Item | Description |
|-------------|-------------|
| Inspection Time | Inspection time |
| Inspection Station | Station being inspected |
| Inspector | Person performing inspection |
| Inspection Item | Item being checked |
| Check Result | Inspection result |
| Abnormal Description | Issues found (if any) |
## 6. Finished Product Inspection (FQC/OQC)
### 6.1 FQC (Final Quality Control)
**FQC Inspection Content:**
| Inspection Category | Inspection Item |
|---------------------|-----------------|
| Visual Inspection | Color, marking, packaging |
| Dimension Inspection | External dimensions |
| Function Inspection | Electrical performance test |
| Safety Inspection | Safety item test |
| Reliability Inspection | Aging test, etc. |
### 6.2 OQC (Outgoing Quality Control)
**OQC Inspection Content:**
| Inspection Item | Description |
|-----------------|-------------|
| Quantity Verification | Verify outgoing quantity |
| Visual Check | Check packaging appearance |
| Marking Check | Check labels and markings |
| Random Sampling | Sampling per sampling plan |
| Documentation Check | Check accompanying documents |
### 6.3 Finished Product Receiving Process
**Receiving Conditions:**
```
FQC Passed → OQC Passed → Packaging Complete → Finished Product Receiving
```
**Receiving Requirements:**
| Requirement | Description |
|-------------|-------------|
| Inspection Complete | FQC/OQC inspection must be completed |
| Inspection Qualified | Inspection result must be qualified |
| Batch Identification | Must have batch identification |
| Packaging Complete | Packaging must be intact |
| Quantity Accurate | Quantity must be accurate |
## 7. Quality Exception Handling
### 7.1 Defective Product Classification
| Defect Category | Description | Handling Method |
|-----------------|-------------|-----------------|
| Visual Defect | Color, shape, surface defects | Rework/Scrap |
| Dimension Defect | Dimension out of tolerance | Rework/Downgrade |
| Function Defect | Function not meeting standard | Rework/Scrap |
| Performance Defect | Performance not meeting standard | Rework/Downgrade |
| Safety Defect | Safety hazard | Scrap |
### 7.2 MRB Handling Process
**MRB Process:**
```
┌──────────┐ ┌──────────┐ ┌──────────┐ ┌──────────┐
│Defective │───▶│ MRB │───▶│ Review │───▶│ Disposal │
│Identify │ │ Initiate│ │ Judgment │ │ Execution│
└──────────┘ └──────────┘ └──────────┘ └──────────┘
```
**MRB Disposal Methods:**
| Disposal Method | Description | Approval Requirement |
|-----------------|-------------|---------------------|
| Rework | Return to process for reprocessing | Requires approval |
| Downgrade | Use at lower grade | Requires approval |
| Concession Acceptance | Accept under special circumstances | Senior management approval |
| Scrap | Direct scrap | Requires approval |
| Return | Return to supplier | Contact supplier |
### 7.3 Quality Exception Handling Steps
**Handling Steps:**
1. Discover quality issue
2. Isolate non-conforming products
3. Label non-conforming products
4. Create MRB document
5. Quality review
6. Determine review result
7. Execute disposal plan
8. Confirm disposal
**[Tip]** Non-conforming products must be stored in isolation to prevent misuse.
## 8. Quality Traceability
### 8.1 Traceability Content
**Traceability Data Elements:**
| Traceability Element | Traceability Content |
|---------------------|---------------------|
| Material Origin | Raw material supplier, batch |
| Production Process | Process, equipment, personnel |
| Quality Data | Inspection records, defective products |
| Equipment Data | Equipment parameters, status |
| Environmental Data | Production environment conditions |
### 8.2 Forward Traceability
**Forward Traceability Process:**
```
Material Batch → Semi-finished Batch → Finished Product Batch → Customer
```
**Traceability Query:**
1. Input finished product batch number
2. Query finished product production information:
- Production work order
- Production process
- Production time
- Operator
- Equipment used
3. Query materials used:
- Material batch
- Supplier
- IQC inspection result
4. Continue tracing upstream materials
### 8.3 Reverse Traceability
**Reverse Traceability Process:**
```
Finished Product Batch → Semi-finished Batch → Material Batch → Supplier
```
**Traceability Query:**
1. Input material batch number
2. Query material usage:
- Work orders used in
- Processes used in
- Finished product batches produced
3. Query finished product destination:
- Shipping records
- Customer information
### 8.4 Traceability Query Example
**Query Scenario:** Customer complaint about quality issue in a product batch
**Traceability Steps:**
1. Query using batch number provided by customer
2. Trace this batch's:
- Production work order information
- Production status at each process
- Material batches used
- Material suppliers
- Quality inspection records
3. Analyze quality issue root cause
4. Determine impact scope
5. Notify affected customers
6. Develop improvement measures
**Traceability Result Example:**
| Item | Information |
|------|-------------|
| Finished Product Batch | LOT-20260410-001 |
| Product Model | PCB-1000 |
| Production Work Order | WO-20260410001 |
| Production Date | 2026-04-10 |
| Production Line | SMT-A Line |
| Operators | Zhang San, Li Si |
| Materials Used | Solder batch LOT-S-001 (Supplier: Company A) |
| Inspection Records | First article qualified, patrol inspection qualified |
| Shipping Records | Shipped to Customer B, quantity 1000PCS |
## 9. Quality Statistics and Analysis
### 9.1 Quality Indicators
**Core Quality KPIs:**
| Indicator | Calculation Formula | Target Value |
|-----------|---------------------|--------------|
| Incoming Qualification Rate | IQC Qualified Lots/IQC Total Lots × 100% | ≥98% |
| Process Qualification Rate | IPQC Qualified Quantity/IPQC Total Inspected × 100% | ≥99% |
| Finished Product Qualification Rate | FQC Qualified Quantity/FQC Total Inspected × 100% | ≥99.5% |
| Defective Rate | Defective Quantity/Total Production × 100% | ≤1% |
| Batch Traceability Rate | Successfully Traced Batches/Total Batches × 100% | 100% |
### 9.2 Quality Reports
| Report Type | Description | Target User |
|-------------|-------------|-------------|
| IQC Daily Report | Daily incoming inspection statistics | IQC Team Leader |
| IPQC Daily Report | Daily in-process inspection statistics | IPQC Team Leader |
| Quality Monthly Report | Monthly quality summary report | Quality Manager |
| Defect Analysis | Defect root cause analysis | Quality Engineer |
| Trend Analysis | Quality trend analysis | Quality Supervisor |
### 9.3 SPC Statistical Process Control
**Control Chart Monitoring:**
| Control Chart Type | Monitoring Content | Application Scenario |
|--------------------|-------------------|---------------------|
| X-bar Chart | Mean value monitoring | Measurement data |
| R Chart | Range monitoring | Measurement data |
| P Chart | Defective rate monitoring | Count data |
| C Chart | Defect count monitoring | Count data |
**异常判定规则:**
| Rule | Judgment Condition | Description |
|------|-------------------|-------------|
| Rule 1 | 1 point outside control limits | Single point abnormality |
| Rule 2 | 9 consecutive points on same side of center line | Shift abnormality |
| Rule 3 | 6 consecutive points increasing or decreasing | Trend abnormality |
| Rule 4 | 14 consecutive points alternating up and down | Periodic abnormality |
---
**End of Quality and Traceability**